- Commissioning of project
a) Obulavaripalle (OBVP) to Krishnapatnam (KAPT) (114 Km.) – Electrified New BG Line Port connectivity Project was sanctioned by Railway Board after examination in 2006-07
b) Construction of the Project was undertaken by RVNL, through a Construction Agreement signed by KRCL with RVNL on 29/09/2011.
- Project Phase-I -21 Km Single Electrified Line between VKT-KAPT – Line Operational since 15th November, 2008
- Phase–II -93 KM Single Electrified Line between VRJN-OBVP – Line Operational since 3rd July, 2019.
- Phase-III Doubling of 21 Km Single Electrified Line between VKT-KAPT (Ph- I line) – Line Operational since March, 2014.